
PULSE 6 SERVICE MANUAL
PAGE 7.7
2009SUNRISE MEDICAL
Section 7
Shock Removal
The shocks used in this power base are pre-
adjusted at the factory. Contact Sunrise Medical
Technical Service if adjustment is required.
1. Remove the batteries. Refer to the Battery
Removal section of this manual.
2. Remove the motor/gearbox assembly from
the side on which you are removing the shock.
Refer to Motor/Gearbox Removal section of this
manual.
3. Use a 17 mm wrench and remove the top
bolt securing the shock to the base (fi g. 7.20).
4. Use two 19 mm wrenches and remove
the bottom nut and bolt securing the shock to the
base (fi g. 7.21 & 7.22).
5. Lift the shock from the base.
6. Reverse the previous procedures to install
the shock.
Removal Procedures (cont.)
fig. 7.20
fig. 7.21
fig. 7.22
Comentários a estes Manuais